Metrosystem.17

What’s new in Metrosystem.17

-city will not carry out construction on a field designated for a planned section
-likelihood of encountering unexpected difficulties during geological surveys or the construction of a section depends on the existing level of knowledge regarding the local geological conditions
-larger exhibition halls may be generated during the startup
-dissatisfaction within a district is now indicated differently when the geological situation viewed
-the term housing estate may appear in station names suggested by the city
-factories can be established outside city limits in later stages of the game
-fields where demolition will occur during the construction of a section are now more clearly marked
-display of construction sites adjusted
-depth limit for cut-and-cover sections can now be disabled in game settings
-fields marked as heritage may generally have an increased transport potential
-rivers can now feature islands and oxbows
-inactivity penalty setting is only available if public satisfaction in city districts or the city government satisfaction is enabled
-service station symbol redesigned
-hydrological conditions are now generated also around ponds
-geological situation data view now indicates where demolition may occur
-construction requirements for panel buildings adjusted
-option to start the game without any debt
-fixed a bug that allowed demolition in fields where any project planning is generally prohibited
-optimized the calculation of station utilization estimate
-refined the placement of airport terminals
-crossover, stabling track, or service station can now be constructed in existing surface level section
-protected areas
-coach stops
-fixed minor errors in the generation of certain types of city districts
-locations where construction for the city is possible are now also displayed in the transport potential and popularity in city district data view
-reduced penalties for failing to meet a requirement to build a route to a specific city district
-fixed the evaluation of sufficient number of shafts in the first section of a line
-higher operating subsidies, or a higher level of co-financing for required connections
-ongoing financial rewards based on the number of passengers transported and the city government satisfaction
-improved track gradients near the depot check
-construction for the city now have a greater impact on satisfaction within the affected district and among the city government
-extended deadlines for fulfilling construction requirements
-an option to allow terrain modifications with no height restrictions in settings

shot17 1

shot17 2

shot17 3

shot17 4

shot17 5

shot17 6