Sources: NTT Data is in advanced talks to build a data center for Anthropic in Osaka of up to 500 MW, among Japan’s largest, potentially costing $6.3B (Nikkei Asia)
Candid conversations with the leaders shaping what’s next in AI and the broader tech industry. Hosted by Alex Heath, who has covered Silicon Valley for more than a decade.
Veteran tech reporter Alex Konrad sits down with breakout entrepreneurs taking on the status quo to shake up their fields in AI, design, nuclear energy, space, and more.