Full steam ahead on the Snowdon Mountain Railway – in pictures

Engine No 5, Moel Síabod, between Clogwyn and the summit. A traffic controller at Llanberis controls the movement of trains. Communication between Llanberis, Clogwyn and the summit, as well as the guard of each train, is by means of two-way radios

The Guardian

Leave a Reply